Technology projects shaped around the people and places they serve

Seventeen projects showing how software, border systems, biometrics, infrastructure, healthcare technology and specialist integration solved real problems.

Experience available through BNR

Different settings, each needing an answer that worked.

These projects were delivered by BNR or by predecessor companies whose customer knowledge and technical experience now continue through BNR Computer Services Ltd.

Each story covers the starting point, the work delivered and what changed. Photography is illustrative.

Project library

IT & Infrastructure case studies

Choose a business unit or browse the complete collection across software, border management and IT infrastructure.

IT & Infrastructure case studies8 projects
Specialist working on self-service kiosk equipment

Product sourcing

KT Group self-service kiosks

Since 2010, BNR has supplied tens of thousands of component kits and built hundreds of PCs for repeatable kiosk production.

Read case study
Representative property-sector team using connected workplace technology

IT system migration

Stanhope

A coordinated document-system and workplace migration helped 51 to 100 users work more flexibly from the office and remotely.

Read case study
Representative service command centre with multi-screen workstations

Specialist procurement

Dell Limerick Service Command Centre

BNR researched and sourced a coordinated package of specialist command-centre equipment, meeting Dell’s required 2007 deadline.

Read case study
Representative lower-energy computing deployment in a healthcare workplace

Low-carbon computing

South Warwickshire NHS

In 2013, BNR built around 300 ultra-compact PCs estimated to use 75 to 90% less energy than conventional desktops.

Read case study
Representative fibre-network commissioning in a technology production facility

Network infrastructure

Hyve Solutions Europe

BNR installed and certified a new fibre backbone outside production hours, increasing capacity without interrupting live operations.

Read case study
Representative audiovisual and IT commissioning in a remembrance exhibition centre

Exhibition technology

National Memorial Arboretum

For the principal contractor, DPM Systems Ltd coordinated technology installation, other trades, testing and external audit through to programme completion.

Read case study
Representative technicians working across multiple computer repair lines in a large service centre

Specialist equipment supply

Dell Pan-European Service Centres

Seven years of research, stockholding and coordinated supply kept specialist equipment available for five European service centres.

Read case study
Representative engineer installing a thin client at a charity worker’s desk

National technology rollout

The Salvation Army 10ZiG Rollout

Detailed pre-kitting and asset control helped replace approximately 800 workplace terminals across 122 sites within a compressed timetable.

Read case study

How BNR approaches project work

Understand what is happening before changing the technology.

01

Start with the real process

Find where people, information or equipment are being held back.

02

Keep essential services working

Improve the weak point without discarding systems that still do their job.

03

Retain useful knowledge

Keep the customer and technical context needed for maintenance and later change.