An 18-month plan compressed
The pilots established a repeatable method, but the main challenge emerged when the expected 18-month window became a much shorter live programme. Equipment for every site arrived at BNR and had to be controlled centrally. Each engineering team needed enough of the correct terminal models, peripherals and three display-cable options for its route, while site availability, travel and unforeseen conditions continued to change.